Expro Excellence
Downhole Service Tools
14” BRUTE® Packer suspends well with Liner Hanger landing string suspended below packer BHA
Customer challenges
  • Expro’s 14” BRUTE® Storm System was deployed on a deepwater drillship in the Gulf of Mexico during the 2020 Atlantic storm season
  • Following the installation of the 9 -3/8” liner, Hurricane Laura interrupted forced the operator to halt operations and suspend the well
Expro Excellence
  • With limited time and no opportunity to retrieve the liner hanger running tools and landing string, the operator opted to suspend the liner running BHA below the 14” BRUTE® Storm System
  • The 14” BRUTE® Storm System successfully suspended the wellbore with 550,000 lbs. of hang weight below the packer and a verification pressure test of 2,300psi
  • After 21 days, the 14” BRUTE® Storm System was successfully retrieved from the wellbore without incident
Value to client
  • Expro enabled the operator to suspend the well quickly using a high tensile load, allowing the rig to move out of the storm’s path without delay
  • The BRUTE® Storm System avoided the need to pull additional tailpipe due to the packer constraints, potentially preventing the rig from being caught in a dangerous storm path
  • Despite some damage sustained during evacuation, which extended downtime to 21 days, the safe and incident-free recovery of the BRUTE® Storm System prevented any further delay in the well schedule
Contact

14” BRUTE® Packer suspends well with Liner Hanger landing string suspended below packer BHA

In Brief
14" BRUTE® Storm System allows drillship to quickly suspend wellbore and evade Hurricane Laura
Product Line
  • Downhole Service Tools
Region
North and Latin America
Customer challenges
  • Expro’s 14” BRUTE® Storm System was deployed on a deepwater drillship in the Gulf of Mexico during the 2020 Atlantic storm season
  • Following the installation of the 9 -3/8” liner, Hurricane Laura interrupted forced the operator to halt operations and suspend the well
Expro Excellence
  • With limited time and no opportunity to retrieve the liner hanger running tools and landing string, the operator opted to suspend the liner running BHA below the 14” BRUTE® Storm System
  • The 14” BRUTE® Storm System successfully suspended the wellbore with 550,000 lbs. of hang weight below the packer and a verification pressure test of 2,300psi
  • After 21 days, the 14” BRUTE® Storm System was successfully retrieved from the wellbore without incident
Value to client
  • Expro enabled the operator to suspend the well quickly using a high tensile load, allowing the rig to move out of the storm’s path without delay
  • The BRUTE® Storm System avoided the need to pull additional tailpipe due to the packer constraints, potentially preventing the rig from being caught in a dangerous storm path
  • Despite some damage sustained during evacuation, which extended downtime to 21 days, the safe and incident-free recovery of the BRUTE® Storm System prevented any further delay in the well schedule